The territory of the former military town # 65.
There are no real estate on the industrial site.
National Highway - 5 km. Hard paved driveway - 5 m.
High-pressure gas pipeline of the first category (Du = 250 mm).
The voltage of the transmission line is 10 kV. In order to connect industrial facilities to Zaporizhiaoblenergo's Zaporizhzhya REM networks, it is necessary to obtain the technical conditions and conclude a connection agreement.
Voltage at transformer substation 35/10 kV from 2 sections 10kV.
There is a possibility of connection to the water supply in the village of Bilenke (distance to the closest possible connection point is 600 m). But according to KP "Vodokanal" on the Dnieper water supply facilities of the ICE-2 there is no capacity reserve.
Adjacent land users are private property leased to Valena LLC Field 57.59.